top of page
  • Black Instagram Icon

DIY Crow lab: Taking a soil core with an auger 1m

Join Hannah and Casey as they go through the process of collecting a 1m soil core! Part 1 includes the first core 0-20cm, using a 20cm auger at the Lyon Arboretum. Part 2 includes the end of the sampling method from 80-100cm. The entire process took us about 25 minutes from start to finish. The first and last core (of the five 20cm core samples) are include with some helpful tips and tricks for soil sampling in the field. Special thanks to the new Crow lab intern Mathilde for videotaping this DIY!

Part 1: 0-20cm top of the core sampling

Part 2: 80-100cm bottom of the core sampling


 
Never Miss a Post!

2017 by Casey McGrath 

    bottom of page